During my last ship, one of the best thing was to see the
installation of new topside platform at the Baronia oilfield but I just can see
from afar because no any movement and other operation allowed within 500 meter
zone. This operation only can be done by special purposes for the topside
operation. This topside was delivered by
Xiang Rui Kou (XRK), semi-submersible vessels from Hyundai Heavy Industries,
Korea. The vessel will remove the sea-fastening, de-ballasted and maneuvered in
between the jacket (sub-structure) in DP mode. As soon as the vessel is exactly
in the correct position, the vessel will ballasts quickly bringing the topside
in contact with the jacket and put on top of the jacket. When the topside
already on top of the jacket, with sufficient gap between the vessel and
topside. Then the vessel will maneuver out of the jacket. Within 7 hours, one
new big platform established at this oilfield and it was really amazing.
|
new platform |
|
just using the binocular to zoom in
|
Comments